about us   |   contact us   |   gallery  |   bios
Lgarde Home home     Lgarde Programs programs     Lgarde Programs products     Lgarde Programs capabilities     Lgarde Programs papers     Lgarde Programs employment
Antennas:
Inflatable Antenna Experiment
Deployable Waveguide

Space Power:
Power Antenna


Space Structures:
Solar Sails
SSP Truss

Spartan 207
IAE Home Page
General Information
Integration at KSC
Canister Preparation #1
Canister Preparation #2
Canister Preparation #3
Deployment Photos
PAD Closeouts
L'Garde/IAE
Image Library

L‘Garde Programs - INFLATABLE ANTENNA EXPERIMENT

The Spartan 207/IAE Team at PAD Closeout on May 3rd
With the Payload Ground Handling Mechanism (PGHM) still in place and having completed PAD closeouts, the Spartan 207 Integration Team stands in front of the Spartan 207/IAE payload. Pictured from LEFT to RIGHT: Maggie Carson, Paul Wescoat , Mark Steiner (Mission Manager), Debbie Wheeler, Nicholas Teti, Rick Kinder, Greg Martins, Brian Kittle, Geoff Williams, Dave Peters.

Spartan 207/IAE Shown Vertical in Orbiter Bay

After completion of PAD closeouts the Payload Ground Handling Mechanism (PGHM) is moved back. The picture shown here is a view of the Orbiter Payload Bay just before the closing of the Payload Bay Doors.


Spartan 207/IAE Integration Team
After a long, but extremely successful day, the Spartan 207/IAE integration team poses for a picture in front of the GAS Bridge Assembly which is also a Goddard managed payload on STS-77.
Spartan 207/IAE - Crew Walkthrough

Spartan 207/IAE - Canister Preparation #1

Spartan 207/IAE - Canister Preparation #2

Spartan 207/IAE - Final Hours at MPPF

L'Garde Inflatable Antenna Experiment (IAE)
Copyright © 2006 L’Garde. All Rights Reserved. Designed by MPDsigns